On the main / Add to favorites
Search: 
 
 
 
 



All news



 

The complex of the implemented operations

The MTA Company realizes the full complex of the dredging operations, beginning with the sandpits researches, designing and coordinating as well as the implementation of the dredging operations and finishing with the recultivation of sandpits.

The right to the realization of a full cycle of the dredging operations belonging to the MTA Company group is documented by the CPO certificates on the admission to engineering researches, preparation of the project documentation; to building works, reconstruction, and major repairs of the projects of the fundamental constructions.

We offer the collaborations in the following directions:

  • Extraction of the nonmetallic minerals with the fraction division;
  • Creation of the ground reserves in a stack;
  • Realization of the engineering operations in building roads and railways, dams, bridge crossings as well as the projects of industrial and civil building;
  • Construction of the oil and gas deposits which is the building of intratrade roads, oil drilling platforms, arrangement of such transport communications as oil-, gas- and pipelines;
  • Building of the navigable and irrigational channels, artificial water basins, moorages, as well as the dredging works;
  • Construction of the riverside barriers and the banks silting.

The MTA Company attributes its strategic plans with the further development of the fuel and power complexes and as well as the road infrastructure. We are ready to cooperate with the new partners and realize the projects both in the Russian Federation and abroad.

Certificates

 
 
 
© 2017 The closed joint-stock company «MTA Company»
Производство гидромеханизированных работ